(1) Level the rack, frame and frame at the same time, place the rack in place, and connect the racks according to the instructions in the manual. After the level is corrected, the rack should be securely fastened.
(2) The tape roller, the roller supporting the tape is fixed on the frame, and after leveling, the rubber filter tape is spread on the roller. The driving roller and the driven roller are hoisted to the middle, that is, the middle of the rubber filter, and then moved to the two ends, respectively, and the bracket and the bearing seat are installed.
(3) Assembling and seating the vacuum box components, connecting the vacuum boxes in sequence, and aligning them with the small rollers, the lifting mechanism, the winch frame, etc., and tightening the frame and the frame with bolts. .
(4) Install the feeding device, the washing device small roller, the filter cloth tensioning device, the filter cloth adjusting device, and the scraping device.
(5) Install the connecting hose, and require tight connection without leakage.
(6) Drive the device, position the drive frame, install the reducer and the coupling, and ensure the coaxiality between the drive roller and the motor shaft.
(7) The pneumatic system, air control and deflection cylinder are connected by high pressure hose.
(8) Piping system, joint feeding, washing, cleaning and vacuum system piping.
(9) Electronic control system, connecting electric control cabinet and drive motor, gas control cabinet, joint and pipeline valve.
(10) Filter cloth, place the gravity roller of the filter cloth in the loosest position of the filter cloth, find the arrow of the movement direction of the filter cloth, and then pass the filter cloth through the feeding box, the washing box, the driving roller, the filter cloth gravity and the deviation Roller, roller, etc., flatten it, butt the two ends of the filter cloth and thread the wire. Check the flushing line before installing the filter cloth to ensure that all nozzles can flush the net filter cloth.